The restoration of river Liesing in Vienna included the following activities:
- Remodeling of all low weirs
- Removal of grouted pavement and construction of a substrate-covered and widened riverbed
- Creation of shallow water zones, gravel banks and sedimentation zones
- Different bottom widths, flow velocities and water depths
- Natural remodeling and planting of the embankments
- Use of biological engineering construction methods for bank protection
Find more information here.
Country:
Austria
City:
Vienna
River:
Liesing
Budget:
8 Mio. €
Length:
5,5 km
Year:
2002 - 2006