The remodeling of the Mill River Park included the following activities:
- Removal of the shore protection
- Creation of paths, seatings and viewpoints along the river
- Dismantling of a dam
- Creation of floodplains
- Stabilisation of the banks with plants
- Installation of huge stones to steer the flow (natural meandering in urban setting not wanted)
- Development of shallow waterfront areas for better accessibility
Further information here and here.
Country:
United States
City:
Stamford
River:
Mill River
Budget:
11,8 Mio. $
Area:
0,1 km²
Year:
2013 - 2013